Projects 2013

Integer lacinia luctus euismod. Donec tristique dapibus tellus ut lobortis. Fusce mollis eros in nunc auctor sit amet imperdiet nisl imperdiet. Donec varius mauris ac urna condimentum ultrices. Vestibulum tempus vehicula dolor id fermentum. Phasellus suscipit nisi eu mi tincidunt ultrices. Phasellus a libero id massa suscipit pellentesque in sed urna. Proin quis convallis ligula. Donec adipiscing volutpat urna, vitae fringilla nibh pretium at. In tincidunt convallis mi, non tempor ante bibendum rutrum. Aenean eget felis tellus. Praesent tellus metus, viverra vitae pellentesque id, consectetur id magna. Sed pellentesque suscipit imperdiet. Mauris blandit eros eu orci volutpat et dictum nunc fermentum. Donec nisl tortor, semper ac porttitor eget, pellentesque placerat metus. Duis mollis pellentesque nisl eu dignissim.

Table of projects

Projekti
Project name Location Duration Financing Short description
Preparation of a feasibility study for the reconstruction and completing the construction of the water supply system Pusta Reka Doljevac, Republic of Serbia January 2013-ongoing USAID Sustainable Local Development Projects Elaboration of a feasibility study (for reconstruction and completing the construction of the water supply system Pusta reka) and exploring the possibility of linkage with other regional systems
Water and Sewerage Programme in Medium-Sized Municipalities in Serbia, Programme I, Phase 2 Republic of Serbia: Kraljevo, Loznica, Pančevo, Smederevo, Šabac, Sombor, Vršac October 2010-November 2013 KfW; Investment volume: EUR 39,000,000 Task 3A:
Implementation of a Non-Revenue Water NRW action plan including district metering
• Implementation and monitoring of NRW-reduction plan
• updating of digital maps – updating of data bank
• establishment of GIS system for monitoring of NRW activities • Update the hydraulic model for pipes ≥ DN 50
• theoretical and practical training for reduction of Non-Revenue Water

Task 3 B:
Develop and implement / monitor comprehensive operation and maintenance plan

Task 4:
Preparation of FINAL DESIGN – review of Existing Design.
• Final engineering design and cost estimates

Task 5:
PREPARATION OF TENDER DOCUMENTS– support in bidding procedure and evaluation FIDIC RED BOOK: for network
Item 3 Description Shipping: $3.00 $3.00
Item 4 Description Tax: $4.00 $4.00